Photos from the Gregor Wallace Collection
The 1960s saw prolonged droughts and harsh water restrictions in Melbourne. There were also deadly bushfires on the fringes of the city in the Dandenong Ranges in 1962, and again in 1968.
Growing concerns about long-term water security led to a Parliamentary Public Works Committee inquiry between 1965 and 1967.
In response to the Inquiry’s final report, the Bolte Government immediately approved works for a 20 km diversion tunnel from the Thomson River in Gippsland into the Upper Yarra reservoir. Detailed planning also began for the construction of the massive Thomson Dam to significantly add to Melbourne’s water storage capacity.
The dam wall and diversion tunnels were built in three stages between 1969 and 1985.
The works included an additional 7-foot diameter pipeline along the Yarra Valley to take the increased flows.
These photos were taken near La La Falls, south of Warburton township on the 11 October 1974.
The photos cover two pipe sections from their arrival on the site to bedding onto screenings pads in the trench dug for them. The easement was widened significantly to allow for the new pipeline.
By today’s standards it looks like a fairly casual workplace.






























You mention it looks casual by today’s standards; what safety or earthworks practices stand out most in these photos compared with modern pipeline jobs? Any shots of the bedding and trench preparation you could share?
Hi Peter
Another fine piece of regional history!
My home is barely 250 metres north of this pipeline (and what a tricky traverse that build was, back in the day).
A minor correction if I may: La La Falls – not Lal Lal.
Thanks for all the great records over many, many years.
Officially called the Yarra Valley Conduit by the MMBW.